List of crewed lunar landers
This is a list of designs for crewed lunar landers , spacecraft intended to land on the Moon. A key aspect is achieving a soft landing , and for an ascent stage to successfully escape the Moon 's gravity.[ 1] Another aspect is how many stages the design has to undergo to achieve its objective, and the number of passengers and amount of payload it can carry.[ 1]
Name
Manufacturer
Operator (program and operational timeline)
Stages
Crew
Payload Mass
Status
Image
Altair
Northrop Grumman
NASA (Constellation , 2005–2009)
Descent, Ascent
4
14,500 kg (32,000 lb)
Canceled
Apollo Lunar Module
Grumman
NASA (Apollo , 1969–1972)
Descent, Ascent
2
Retired
Boeing Lunar Lander
Boeing
Boeing, NASA (Artemis , 2017–present)
Descent, Ascent
Rejected
[1]
Dynetics HLS
Dynetics
Dynetics, NASA (Artemis, 2017–present)
Single-stage with drop tanks
2-4
Rejected
[2]
Blue Moon Mark 2
Blue Origin , Lockheed Martin , Northrop Grumman , Draper Laboratory
Blue Origin, Lockheed Martin, Northrop Grumman, Draper Laboratory, NASA
Transfer, Lander/Ascent
4
Planned
[3]
Lanyue Lunar Lander
CAST
CMSA (CLEP )
Descent propulsion stage, Lander/Ascent
2
Planned
LK
RSC Energia /Yuzhnoye Design Office
Soviet Union (N1-L3 , 1969-1974)
Descent, Ascent
1
Canceled
Lockheed Martin Lunar Lander
Lockheed Martin
Lockheed Martin, NASA (Artemis, 2017–present)
Single-stage
4
1,000 kg (2,200 lb)
Rejected(elements incorporated into Blue Moon Mk 2)
[4]
Starship
SpaceX
SpaceX
Single-stage
Planned
[5]
Starship HLS
SpaceX
NASA (Artemis, 2017–present), SpaceX
Single-stage
4
100–200 t (220,000–440,000 lb)
Planned
[6]
BIS Lunar Lander [ 2]
British Interplanetary Society
Single-stage
3
Studies (1939, 1947)
Von Braun Lunar Lander [ 3]
US (1977)
Single-stage with drop tanks
20
259 metric tons (with a crew of 10)
Study (1952)
Horizon LERV [ 4]
US Army (Project Horizon , 1966)
Descent, Ascent
10 - 16
2,700 - 22,000 kg
Study (1959)
Lunex Lunar Lander [ 5]
US Air Force (Lunex Project , 1967)
Descent, Ascent
3
20,500 kg
Study (1958–1961)
Gemini lunar lander
NASA Langley Research Center, (Project Gemini , 1963)
Single
1
Canceled
LEK [ 6]
Soviet Union, (Zvezda Moon base , 1974)
Descent, Ascent, Reentry
3
Canceled
FLO Eagle lander
NASA (Space Exploration Initiative , 1992–93)
Descent, Ascent
4
5,000 kg
Canceled
See also
References
External links
Exploration programsActive missions
Orbiters Landers Rovers Flybys
Past missions
Planned missions
Proposed missions
Cancelled / concepts Related
Missions are ordered by launch date. Crewed missions are in italics .