MBIR
The MBIR is a multi-loop research reactor capable of testing lead, lead-bismuth and gas coolants, and run on MOX fuel. MBIR intends to replace the old BOR-60 experimental fast reactor that started operations at RIAR's site in 1969. It will have a design life of 50 years.[3] HistoryConstruction has started in 2015.[4] MBIR control assembly was installed in 2019.[5] Reactor vessel was installed in 2023.[6] Pilot fuel elements were produced in 2024. The MBIR is scheduled to begin operation in 2027.[3] Estimated commissioning date is 2028.[2] See also