Most of the projects on the original list are funded through Measure R and Measure M and will receive accelerated priority, though several more were proposed by this plan.[1] In December 2018, the Los Angeles County Metropolitan Transportation Authority stated it would need $26.2 billion to complete the list of projects.[2]
In March 2024, the Metro Board substituted 11 projects that could not be implemented in time for the 2028 Olympic and Paralympic Games with 11 projects that would be able to hit this deadline and are in line with the agency's 2028 Mobility Concept Plan.[3]
Interstate 405 Integrated Corridor Management, between Manchester Ave. and Rosecrans Blvd
2028
Substituted projects
The following 11 projects were included in the original 2018 project list but were substituted in March 2024 with 11 operational/in-progress projects that would better meet the 2028 Olympic and Paralympic Games deadline.