Chiahui Power Plant
The Chiahui Power Plant (traditional Chinese: 嘉惠電廠; simplified Chinese: 嘉惠电厂; pinyin: Jiāhuì Diànchǎng) is a gas-fired power plant in Songshan Village, Minxiong Township, Chiayi County, Taiwan.[3][4][5] HistoryThe construction of the power plant began in January 2002 and the commissioning of unit 1 of the plant was done in December 2003.[6][7] The project is the first independent power producer project in Taiwan. In July 2020, the power plant was awarded Occupational Safety and Health Administration Agency's Model Site Award.[8] A second unit was added to the plant beginning in December 2018; it was commissioned in August 2021.[9] OwnershipAsia Cement Corporation (ACC) and its affiliates owns 59% of equity share, while J-Power owns 40%. The remaining 1% share is owned by other private shareholders. In September 2020 J-Power sold all its shares to ACC.[10] Generation unitsThe power plant has a total installed generation capacity of 1210 MW, consisting of two generation units.[1][2] Unit 1 has an installed capacity of 670[11] (or 700)[1][2] MW. It consists of multiple-shaft combined cycle unit with one steam turbine-generator, three gas turbine generators and three heat recovery steam generators, designed for natural gas firing. The gas turbine generators came from General Electric with F-class technology and was shipped in 2002. Each has 18-stage axial compressor and 3-stage turbine. It also features a cold-end drive and axial exhaust.[11][12] Unit 2 has an installed capacity of 510[1][2] (or 535)[9] MW. FunctionThe power plant is designed for intermediate load operation with daily startup and shutdown to sell power to match the power dispatch schedule of Taipower.[13] The whole generated electricity is sold to Taipower.[6] TransportationChiahui Power Plant is accessible west from Minxiong Station of Taiwan Railways. See alsoReferences
|