Hoping Power Plant
The Hoping Power Plant (traditional Chinese: 和平電廠; simplified Chinese: 和平电厂; pinyin: Hépíng Diànchǎng) is a coal-fired power plant in Xiulin Township, Hualien County, Taiwan.[2] With the installed capacity of 1,320 MW,[3] the power plant is the fourth largest coal-fired power plant in Taiwan. The smokestack of the power plant has a height of 250 metres. Its diameter is 25.1 metres at the base and 17.3 metres at the top. GenerationElectricity generated by the power plant supplies the major load located in north of Taiwan. OwnershipThe power plant is fully owned by Ho-Ping Power Company. The equity interest is divided to CLP Group (20%), Mitsubishi Corporation (20%) and Taiwan Cement Corporation (60%). Events2017On 29 July 2017, a transmission tower for the outgoing lines of the plant collapsed due to Typhoon Nesat which caused the electricity supply to Taiwan down by 4%. The tower was reconstructed on 11 August 2017 and completed in the following day, which became the fastest power line reparation in the history of Taiwan. On 13 August, the plant resumed its operation and reached its full generating capacity the day after.[4][5] On 15 August 2017, the plant tripped due to the breakdown of one of its generator causing a loss of 650 MW power generation.[6] On 23 August 2017, a furnace pipe of generator no. 2 broke, causing a drop in electricity generation.[7] TransportationHoping Power Plant is accessible within walking distance North East from Heping Station of Taiwan Railways. See alsoReferences
Wikimedia Commons has media related to Hoping Power Plant. |